As staff & children left for their summer break 2023, our team at Border Food Machinery stepped in and completed a full kitchen install at a local Cumbrian School.
Incorporating, ovens, refrigeration, cladding, flooring, roller shutter, bespoke servery, peeler, mixer and a full extraction/air intake system, the new kitchen has been completed in plenty of time for the staff & children coming back for the new school term.